Williamson County Landfill Bioreactor Retrofit

Status

Completed

Project Type

Retrofit Forced-Aeration Bioreactor

Project Area

6 Acres

Commencement date

1995

Completion Date

2003

Funding

Public Project

Project description

The Williamson County Landfill project marked a significant innovation in landfill management by retrofitting an existing site into a forced-aeration bioreactor landfill with advanced temperature feedback control.

 Covering 6 acres with a depth of 40 feet, the project managed approximately 63,394 megagrams of waste and introduced over 4.8 million gallons of liquid to optimize biological activity and accelerate waste stabilization.
 
 Operated actively since 2000, this project set new standards for integrating environmental controls into existing landfill structures, dramatically improving gas recovery, decomposition rates, and environmental performance.
Key Details

Features

Forced Aeration Systems

Engineered air flow to boost aerobic decomposition.

Temperature Feedback Control

Real-time monitoring to optimize biological reactions.

Liquid Injection Systems

4.8 million gallons injected to enhance waste breakdown.

Gas Recovery Enhancements

Improved methane capture through accelerated stabilization.

Retrofitted Landfill Modules

Upgraded conventional landfill cells to bioreactor status.

Reduced Greenhouse Gas Emissions

Significant environmental improvements over traditional methods.

Advanced Monitoring Systems

Temperature, gas, and moisture levels continuously regulated.

Operational Efficiency Gains

Faster waste settlement and earlier landfill reuse opportunities.

Location

address
2972 Westheimer Rd. Santa Ana, Illinois 85486
Key transport

Coast
300m

University
750m

Supermarket
500m

Park
1120m

Railway station
1750m

Airport
3158m

Bus station
450m

Bank
415m

Hospital
350m

Request more information